XForms home

Products

3


XForms Mobile

Mobile forms for field data collection

Mobile App

Form Designer

Dashboard

APIs & Integrations

Use Cases

Pricing

Start free trial →



CX2

Commissioning completions, rebuilt · Coming 2027

Completion

Add-ons

Punchlist & reports

Setup

Hand-off

Early access

Request early access →



XDocs

AI documents, from proposal to final report

AI writing

Report builder

Workload & review

How it works

Solutions

Join the waitlist →

NOT SURE WHERE TO START?

Compare the three products side by side

See which one fits your team, or talk to us and we’ll point you to the right tool.

Compare products →

Talk to us →

Resources

3

LEARN

Blog

Product news, how-tos and field stories

Customer stories

How field teams use XForms

Example use cases

Inspections, audits, sampling and more

GET HELP

Support center

Guides, FAQs and login links

XForms Mobile support

XForms Cx support

XDocs support

Contact us

WHAT’S NEW

Release notes

Every update to XForms Mobile and XForms Cx, newest first

LATEST FROM THE BLOG

tracking waste ai screenshot

Tracking waste from cradle to grave using smartphones + AI

All posts →

About

Log in

3

LOG IN TO

XForms Mobile

XForms Cx

XDocs

Contact us
XForms
  • Products
    • XForms Mobile
    • CX2
    • XDocs
  • Resources
    • Blog
    • Customer stories
    • Support center
  • About
  • Contact
  • Log in
    • XForms Mobile login
    • XForms Cx login
    • XDocs login

Tracking commissioning project progress using commodity curves

by jim@xforms.co | Oct 10, 2022 | XForms Cx | 0 comments

commodity curve screen

Relative to commissioning projects, what is a commodity curve?

Simply put, its a way of tracking planned versus actual dates for completions.

There’s lots of writeups about this project controls method for tracking project progress.  One good writeup is a Virginia Department of Trasnportation’s writeup about the subject, which can be found here.   In the article, VDOT explains how tracking project progress using commodity curves is a simple way to make sure major deviations of planned vs. actual scheduled values can be viewed early in the construction process, so that resources can be allocated to the areas of the project showing signs of delays.  Visually-speaking, the charts will plot time on the x-axis, and the cumulative value being tracked on the y-axis. When you plot planned versus actual commodity curves, you will see a difference between the 2 curves at any given point in time on the chart.  This difference is the delta, or the value of the actual work completed that differs from the scheduled work to be completed.  In virtually all cases, the actuals curve will lie below the scheduled curve, indicating delays.  The larger the delta, the larger the delays, which in the world of construction can equate to tens of thousands of dollars or more per day of delay.

Here’s a screenshot of page 11 of the VDOT article mentioned above, titled “Tracking Project Commodities for Progress Control“.  The chart illustrated below shows planned versus actual curves.  The red line is actual, and the black line is planned.  Notice that the delta is greatest around the time value between 4 and 8, suggesting that delays were greatest during that timeframe.  Also notice that the curves are in the same position on time 9 and time 10, suggesting that the project accelerated around time 8 and caught up to the scheduled progress by time 9, with an on-time completion at time 10.

VDOT commodity curve chart comparing planned (black) and actual (red) project progress over time

How this is implemented in XForms Cx

In the case of XForms Cx, commodity curves are set up at the system level. This lets the commissioning manager compare when a particular system is scheduled to be completed versus when a particular system is actually completed.  Two distinct functions are available for plotting:

  • system walkdown
  • system turnover

System walkdown

This is when the construction crew is anticipated to hand over a system to the commissioning crew.  It’s basically the date when a particular system of the construction project has been completed and handed over to the commissioning team to “walk” the system over and verify that the system is actually ready for the commissioning crew to do their thing.

System turnover

This is when the commissioning team has completed all their checklists and tests, and has verified that all the components and devices in that system are working propertly and according to specifications.

How to set up your walkdown and turnover dates

In XForms Cx, this is done from the Manage > Systems screen.  When you go there, you will see your systems displayed in a grid (assuming you imported/added them previously).  On the far right of each listed system row, you can click on the edit icon to pull up that system detail in a popup window, where you can then edit the dates.  There are also two on/off switches that you can toggle to denote when the walkdown or turnover for the system has been completed.

XForms Cx Manage Systems screen for editing walkdown and turnover dates

 Options for populating the commodity curve dates

While you can manually edit the walkdown and turnover dates from the screen displayed above, you can also import these dates.  This is something that you would typically do at the beginning stage of project setup, using the green “Import CSV” button on the top right of the Manage > Systems screen.  First, download the CSV template by clicking on the tiny link immediately to the left of the green Import CSV button.  Then populate it with your system codes, along with your baseline dates for walkdown and turnover.

XForms Cx Manage Systems screen with the Import CSV button for commodity curve dates

Integration with Oracle Primavera P6, Microsoft Project, Procore, etc

We have had some interest to expose the walkdown and turnover dates to our RESTful APIs, so that an integration can be made between some project planning tools and XForms Cx.  While this is not currently available as of the date this article was written, it’s a feature that’s on the product roadmap.

How to view your commodity curves

To view your curves, navigate to Charts > Curves in the Cx Dashboard web app.

XForms Cx Dashboard Curves screen showing commodity curves for commissioning systems

Here’s a short video illustrating the commodity curves feature of XForms Cx in action:

Want to learn more about XForms Cx?

Click/tap the button below.

Contact Us for a Demo

Submit a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Tracking waste from cradle to grave using smartphones + AI
  • Photos in table rows
  • Photo metadata improvements
  • View a map of where your mobile forms were started
  • 36 Pre-Built Commissioning Form Templates, Now Available in XForms Cx

Recent Comments

No comments to show.
XForms logo

Field data, commissioning completions and AI documents for teams who work on site. XForms LLC — Raleigh, NC & Bellevue, WA.



XFORMS MOBILE

Overview

Mobile App

Form Designer

Dashboard

Pricing

Support



CX2

Overview

Completion

Add-ons

Punchlist & reports

Setup

Early access

Support



XDOCS

Overview

How it works

Solutions

Support

COMPANY

About

Blog

Support center

Contact

Privacy Policy

Terms of Service

© 2026 XForms LLC. All rights reserved.

Privacy Policy · Terms of Service